Wednesday, January 2, 2013

"This is looking less shitty by the minute" ~ Matt Oyer

Oven project
Looking a little bit like Dexter
This past Saturday started with no plans (aside from sitting around and doing a few errands) until Halley suggested we finally rip out our dysfunctional wall oven. I was a little surprised, but enjoy spontaneous demo as much as the next guy so we started smashing stuff.

It started with a bit of "exploratory breaking junk" (which didn't really go so well, it turns out there was a stud directly behind where I swung the first hammer. We tried again with a bit more success and proceeded to poke around. We found it was mostly empty (thankfully) and our idea of replacing the antique with some DIY shelving.

What were they thinking with this electrical line?
We took out the oven, pulled the 220V line down into the basement (deal with later, for now we just capped the line and left its independent breaker off) and tossed the oven to the curb. With the oven out of the way, we proceeded to sawzall/hammer/pry/karate chop the rest of the studs and supports to leave us with a nice clean slate to do some terrible construction work.






Living proof of the "do your best, and
caulk the rest" motto
We lined the walls with plywood, and made the shelf supports from 2" x 2"s. The previous electrician took a shortcut and just ran the electric to the wall outlet (for the fridge) on a diagonal, so we decided to take a short cut (mainly because this is a temporary fix until we gut/redo the entire kitchen) and just place one of the shelves directly on top of the electrical line to hide it. We found ourselves saying "I really don't care that much" a little too often during this project, which resulted in a lot of caulk and great stuff being used to hide things.

After all the shelves were in, we mounted drawer slides to another piece of shelving for the bottom shelf. The shelf material we had wasn't deep enough, so we scavenged and found a test piece of oak (we had from the steps we made for our living room - I don't think we have anything about those on the blog, we should put a picture here) and added that to the end (we were lucky it was just about the perfect size)


Once this was all done, Halley decided she wanted another shelf, so we took them all down, and re-spaced them out for four shelves. We then threw some molding around the edges, and a curtain rod/curtain to complete it.  The curtain will be hemmed so its not sweeping up the debris on the floor.

Shelving in..
...curtains up...

...kitchen gear inserted!


Time lapse of the whole project.  There are segments where we're both off camera...because we're in the garage cutting plywood, 2" x 2"'s or melamine shelving.



Tuesday, August 7, 2012

Of door locks, dead-bolts and wall repairs


Replaced Front Door Knob and Deadbolt
Before
If you've been to our house anytime before last week you have probably fought with the knob on our front door. It constantly felt stuck, and somehow loose at the same time. We finally got sick of it and decided to replace it.

We started by removing the existing one, which surprisingly wasnt as hard as 99% of the other "removal" processes we've encountered in this house so far. We did notice an odd rouge screw sitting inside the deadbolt's cavity. We shrugged our shoulders and removed it.

After removing all of the old hardware, we immediately noticed the new strike plate is larger, so we needed to chisel away a new "pocket" for it.
Chiseling away a pocket to fit the new strike plate




After we put everything in place, we wanted to rekey the lock to our existing keys. The locks we bought have a nice feature that lets you set the lock to any key that will fit in it. Halley started reading the instructions and charged ahead on this project. After a short bit we realized that we rekeyed the lock incorrectly so that no key would open the door.

We found some guides on how to "hack" these locks, but decided we'd rather be SURE we can lock the door at night so Halley headed back to Home Depot to get a new lock core.  The gentleman at the key desk gave us a new cylinder for free and re-keyed it to ensure it was done properly.



















Replaced Garage Door Lock

Interior View
We're not quite sure how, but the knob that you turn to lock the bolts into the track of the garage broke and fell out one day.  This left our garage door open to the public for their pillaging pleasure (no one bothered our stuff, thank goodness).  We got a replacement mechanism at good ol' Home Depot, the install was uneventful.
Exterior View







Monitor Mount
The "lair"
Matt has quite a "lair" of a computer room.  While most people get by with a laptop screen, he find 4 monitors allow him maximum productivity for a wide array of projects.  I go along with this scheme because the monitors are almost all second hand, and they are powered down when not in use (which is often).  The fourth monitor now resides over the electronic drum kit, with additional keyboard and mouse to follow.  We've had the monitor mount for a while, but in the move we lost the bracket that mounts to the wall to hold the whole thing up.  After month's of searching, I found it in the yogurt container with the other wall hardware that was hastily removed as we left the apartment.  Now everything is in it's proper place.

Picture Frames
In the effort to put the finishing touches on the Pit, we've hung some of our wall art.  Featured pieces include the finger print tree from our wedding, two photos from my cousin Dave Soffa, a series of photos of the moon through the phases of an eclipse and two prints Matt ordered that he really loves.  One is a quote from a video game and the other is a comic about how the way we think changes as we age.




Car
The new whip
After 21 dutiful years on the road, Matt's Honda Civic puttered for the last time to Uncle Chris's shop.  The cost of repairs represented more than double the Kelly Blue Book value for the car, it was time to say goodbye.  We knew our next car would be a Honda, as we have seen them be fantastic in light of our terrible maintenance record.  Recently Matt commented that my check-engine light was on, I assured him that is was always that color.  After getting the car back from inspection with a few repairs, the light is now off.  I have no idea how long I was driving with it on.  Aaaanyway, back to the new car purchase.

Spreading fur all over the place on Day1
We tried to think of the "most flotsam to transport" scenario.  Our conclusion was going camping at Harper's Ferry with at most two car seats and at least one dog.  The CR-V was the logical conclusion, bigger than the Element, but not as enormous as the Pilot.  We love everything about it and are very grateful to our Uncle Chris for all his advice and help with the transaction.  


On our first trip to Home Depot after the purchase, we stood at a black Toyota Rav4 hitting the unlock button on the keys to no avail.  We've never had a big car like this before and are still getting used to it.  Although we knew Matt's car would bite the dust soon, the purchase will still slow some house projects.  C'est la vie, we love the car and can garden in the mean time.

Bonded Water Heater
One of the items on our "The home inspector told us to do it, so we are going to do it" list was to Bond the Water heater. After googling this a bit, Matt found that most people find this to be a bit overkill, but since it was only about 5$ in hardware we decided to do it anyway. The basic idea is that the cold water line is grounded naturally, but the hot could potentially build up a charge and discharge near a gas line or something scary. So all you need to do is slap some wire between the two. (He did follow the specifications online for gauge and placement, but in reality, it doesn't matter)



Water Heater Pilot
I shower in the morning and the water was just not getting hot, just barely above room temperature, which would explain why Matt didn't notice a problem.  Convinced the water heater was dying, and given the warning that it would need replacing in the home inspection, we started looking online for a new one.  In a stroke of genius, Matt went to check the pilot light, which should have been the first step.  The pilot light was out, causing the total lack of hot water.  Next time before we look to replace something, we should take a better look at the actual machine.

Pit Wall Repair
After the bump out of the wall in the Pit, we needed to do some repair work.  We cut away the layer of wallpaper and sanded the opening smooth.  After a few rounds of spackle, sanding and finally some paint, it doesn't look too shabby.  There is a texture difference, and even a color difference (despite the cans being mixed and purchased at the same time, with the same spec's) which is mostly hidden by the wedding fingerprint picture anyway.

Before
After

Sunday, May 6, 2012

It's definitely getting better

An update on our continuing drywall saga
Thank goodness for goggles
and respirators!
We completed our last coat of joint compound and a final round of sanding.  I am not sure a professional would call it "done" but someone riding by on a horse wouldn't notice our errors.  In consulting my brother, John, for advice he gave me sage advice: "if your gonna do it you may as well do it right."  I laughed really hard when I read this.  We're not trying to do this poorly, but it certainly does seem like amateur hour around here sometimes.  For our next drywalling adventure, I would much rather hire out the work than spend forever and a day dealing with.  To prep for the next step, we threw some primer on the fresh drywall and mud.


Yeah, we have had asbestos...what's it to ya?
Halley, stayin' alive
I packaged up some tile samples from the Pit and laundry room to have the tile and adhesive tested for asbestos.  The tiles were non-friable 10% chrysotile, the most common form of asbestos.  I started panicking, Matt remained calm and started research on the interwebs.  If you're going to have asbestos in your house, vinyl asbestos tile (VAT) is the form you wish for.  It is certainly something to be careful with, but the removal process was not too difficult.  I phoned the Bucks County PA Dept. of Environmental Protection and he put my fears at ease.  Homeowners are able to remove their own VAT (no permit required) and it can be incorporated into the regular waste stream.
Matt, being a sad panda

Prepping the room
We prepped the room by emptying it completely and taping ourselves into in with with plastic sheeting.  The vents and outlets were all taped up and the HVAC system was turned off.  To keep the asbestos off of us we used goggles, respirators with cartridges rated for asbestos, gloves, tyvek coveralls and of course, booties.  Once all the prep work was taken care of, the removal process was quite simple.  We sprayed the area we were working on with "amended" water (which just mean there's a bunch of dish soap in it)  and then used putty knives to pry under the tiles and pop them off.  We had an interesting surprise concerning the strange wall bump-out that required the stupid drywall operation.  For some reason, this wall bump-out was built (perhaps at all?) on top of the tiles.  The tiles were bagged, bagged again and sealed.  Before we opened up the containment zone we collected all the debris from the floor, wiped down all the surfaces and mopped.  When we were ready to break the seal, we ran outside and ripped our masks off to get fresh air.  From start to finish the process took about 3.5 hours.  Glad to be done with that mess.  At some point we'll tackle the laundry room/powder room and perform the same operation there, so after that we'll really not have any asbestos.
The dirt line represents the edge of the
bumped-out drywall...previous home owners
were real dingbats
Molly, trying to get through 2 layers
of plastic....to help?




















Dancing about, post asbestos removal and post
shower, I think "Bare Necessities" from Jungle
Book is playing in my head for some reason.  Molly
is happy to join us on the other side of the plastic
Moving forward
We've finished our first all-over coat of oil-based primer.  After some research I found that using an oil-based primer will prevent the underlying layer of wallpaper from peeling off the walls.  Once this has encapsulated the awful wallpaper, we can pressed on with spackling and sanding the wallpaper seams.  We are hosting Mother's Day for both out families next Sunday, so there are a few key steps to get finished:

  • Sand the wallpaper seams
  • Another coat of oil-based primer all over the place
  • Ceiling paint, on the ceiling
  • Paint the walls
  • Put up crown moulding
  • Pour the self leveling concrete
It crossed our minds to try to get the tiling done before then...but with two full time jobs it isn't going to happen.  We should also try to make a larger dent in our unpacking.  This was a hard week (see Matt's post) but we really got a lot done over the weekend.  Slow, but steady, progress.

Saturday, April 28, 2012

Rome wasn't drywalled in a day

It's been a while since our last update, which isn't to say we haven't been busy but that we haven't finished anything yet.  We were faced with the strange complication of the ceiling in the former office being higher than the rest of the room and the wall being bumped in a little.  Matt consulted with his co-worker Jim Schmidt and I badgered fellow graduate student Brian Ell about what we should do.  Everyone seemed to think that ripping down the existing drywall, adding to the depth of the studs/joists and then re-drywalling was the appropriate plan of action.  Cut to Matt and I mid-drywalling and cursing at life a few days later...but I digress.

Termites
When we did our home inspection we found evidence of an active termite infestation.  A big part of our contingencies for the seller were killing all the termites and repairing any structural damage they caused.  So when we opened the wall and found this nonsense, we weren't too surprised but it was still scary to see.


It appears that the paper backing of drywall is super delicious.  We haven't found any live termites in all the rooting around we've been doing.  To make sure the studs/header/footer were still solid we pounded on them with hammers quite a bit. This is probably the caveman equivalent of what a professional might do.  So no one worries, we do have a contract with a termite company that we'll keep up with.

Furry Creatures
Once the drywall on the walls was down, we started in on the ceiling.  I am extremely thankful that we were wearing goggles and masks when we did this.  Upon removing the first panel we were showered in years of mouse poop.  Cringe.  After I stopped running in circles beating the poop off of me, we carefully finished the job.  We pulled the out of date insulation also which was bagged.  We noticed that a larger critter had likely been visiting the house at some point.



To support our idea that this is damage from a squirrel, we had been finding acorns in the insulation we pulled out of the wall.  I have been referring to the animals as "mouse and squir-ell", pronounced like the villain from Rocky and Bullwinkle, or as my brother called him "Billwinkle."  Once all the terrible horrible insulation was down, we added some upgraded insulation (R19) even though the wall/ceiling are interior.

TK, who I bother all day by
g-chatting about building
plans and design.
Drywall
The people who put up drywall on TV are magicians or there is trick photography going on.  It is really difficult.  My friend TK (real name Katie, but she'll always be TK thanks to rugby), an interior designer who works at an architecture firm, said drywall is no joke and wouldn't hold it against us if we tapped out on the project.  To start, we made a dead-man to support the drywall pieces for the ceiling, which looks like a gigantic T.  We spent no less than 45 minutes trying to properly cut and install a single piece of drywall on the ceiling.  The evening ended with no drywall installed and us thinking about looking on Angie's List for a drywall installer.  The next day at work I got encouragement from Brian again, that jerk, to keep trying and a promise he and his wife would help us.


Brian and Lina Ell at their Summer
2011 weddin'
With a batch of chili started in the crock pot, Brian and Lina arrived for a Sunday of drywall.  I don't know how we would have ever done this without their help.  Matt and I used an....unconventional (?) technique to align the bumped out studs in a single plane.  We used a laser level and shined the beam across the length of the wall to where the studs would hit the floor/ceiling.  Turns out, this is not the ideal use of the level and it's most accurate with the beam parallel to whatever you're doing, not perpendicular (how we were using it).  This resulted in one stud being off by at least 1/2" from the surrounding studs.  There was much cursing and removing the drywall panel and adding shims and putting the panel back on...at least 5 times.  Matt and Brian did the drywall portion of the work, with Lina and I as support staff.  Once it came time for the taping and mudding, Lina and I took over because we know what we're doing and we do this all the time...what?

Lina and Winter, supervising
Brian, saving our lives

Matt was impressed with his own arm size here, take note


Cutting the hole for the HVAC vent, sporting another nerdy shirt.

A few more coats to go
Loitering after a job well done!
 Asbestos Bonanza?
Our plan for this room is to remove the carpet, pad and then the layer of tile to expose the concrete slab.  We'll then apply leveling compound and tile over it with super non-slip tile that will hide dirt.  Not so fast though.  We didn't really get a good look at the underlying tile until today, and it looks quite suspect in the asbestos department.  While fiddling with it I had my respirator on, not to worry.  It is brittle, but doesn't qualify as "friable" which you always worry about with asbestos containing materials (ACM).  Friable means that the material can be crumbled or pulverized using hand pressure, thus releasing fibers into the air...this does not apply to our tile, or historically to vinyl asbestos tile.  More info here, we suspect we are category I, non-friable.  The tiles are quite poorly adhered to the floor and we've popped some off accidentally already.  Step one is to send a sample away to be sure of what we're dealing with.  Assuming it is asbestos, we are going to remove the tile using precautions prescribed by the state of PA, and probably more because I can be a little type A about these matters.  I am forecasting hearing a lot about how this may be a bad idea.  How I approached the situation prior to any research was "lets dig a bunker and hide until some professional shows up to handle this for us."  After researching with Matt, this is something we can do specifically due to the nature of the tile.

Aaaand if it's not asbestos containing....hooray for us!

So a lot has been happening around here, and there is still a lot more to do.  This week I will go into Home Depot and attempt to haggle with them for a discount on the tile.  We are buying enough to cover all area's of the first floor that we'll be remodeling (the Pit, laundry room, powder room, foyer and kitchen).  The tile is neutral enough to go with whatever wacky colors we put on the walls.  Speaking of colors, Behr is much better at describing them than I am.  I was thinking of a "warm mud" type color...the color that Behr calls "pumpkin toast."  I doubt I can ever work in their color naming department.  Here are some choices, feel free to respond which the one that looks nicest on your monitor.


A. Pumpkin Toast
B. Flaming Torch

C. Marmalade Glaze
D. Amber Glow

We like bold colors, so what?  More to come as we continue getting our act together.

Tuesday, April 10, 2012

Ch ch ch changes! (Sing it like David Bowie)

So today we started renovating the room we've been calling "the pit."  It is an informal living room that is a step and a half lower than the rest of the first story because it's been built directly on concrete slab.  It has wide openings to the kitchen towards the rear of the house and to the foyer in the front of the house.  On this level there is also a dumb little office and a coat closet.  All these rooms feature wallpaper on the walls and ceiling, yes even in the closet!  Our game plan is to remove the wall separating the main room from a dumb office.  Here is the starting point:









I will take this time to point out we ran a carpet cleaner over this nonsense twice and the absurd skid marks from years of recliner use are permanent.  And don't judge our mess, we're just trying to spread all of our belongings from the ~680 sq.ft. apartment to the ~2,400 sq.ft. house.

We did a lot of climbing around  in the attic and himming and hawing about whether the dividing wall was load bearing or not.  Matt is trying to get me to pay attention to some detail about the ceiling joists, I am slacking.


The drywall removal began and went pretty quickly.  We used the sawzall (favorite tool by far) to split the studs which weren't even actual 2x4's and Matt used his mass to pry the footer off of the nails that were in the concrete slab.


Done for the night!


There is a slight difference in the ceiling height and wall depth in the office vs the main room.  I think we'll handle this by adding some wooden strips to the ceiling/walls to support a new layer of drywall that will be level with the rest of the room.  We can't think of another way to handle this properly or hide it decoratively so comments are welcome!  Hopefully more to follow soon, assuming we're not too beat.